- Plasterboards[10]
- Sandwich Panels[9]
- Ceiling Grid Components[6]
- Ceiling Tiles[10]
- Calcium Silicate Boards[1]
- Magnesium Oxide Boards[10]
- Other Fireproofing Materials[2]
- Formwork[1]
- Other Heat Insulation Materials[10]
- Metal Building Materials[10]
- Metal Crafts[1]
- Bolts[3]
- Other Fasteners[4]
- Other Construction Material Making Machinery[9]
- Other Machinery[1]
- Steel Channels[1]
- Steel Sheets[1]
- Steel Strips[1]
- Contact Person : Ms. Chen Nancy
- Company Name : Peking Northern Excellent Construction Material Co., Ltd.
- Tel : 86-10-58031971
- Fax : 86-10-58031972
- Address : Beijing,Beijing,Room 1805, Guomeidiyicheng, Qingnian Road16, Chaoyang Distuict, Beijing
- Country/Region : China
- Zip : 100025
Related Product Searches:gypsum board production line,High Quality,gypsum board production line, ceiling board production line,JPL
The offer of gypsum board production line (2 million M2)
SGB-A200: Hot air type SGB-O200: Hot oil type
Equipment Technical parameters
Code | Output | Power | Speed | Power | Weight | Water | Workshop area |
SGB-A200 | 2 million m2/per year | 380V/50Hz/3ph | 4 m/min | 82KW | 50T | 30T/day | L:90m W:12m H:4m |
SGB-O200 | 2 million m2/per year | 380V/50Hz/3ph | 4 m/min | 120KW | 60T | 30 T/day | L:90m W:12m H:4m |
Workers
Code | Workers | Logistics | Production time |
SGB-A200 | 12/shift | 3 | 3 shifts/24hours and 300days/year |
SGB-O200 | 12/shift | 3 | 3 shifts/24hours and 300days/year |
Schedule
Code | Delivery Time | Installation time | Total |
SGB-A200 | 45 days | 60 days | 105days |
SGB-O200 | 45 days | 60 days | 105days |
Price
Code | Price | Include these parts | Not include these parts | |
SGB-A200 | USD125,000 | 1.Whole set line costs 2.Installation costs 3.Charges for technology transfer | )1.Carriage(from our factory to your plant) 2.Air tickets and visa for 6 Skilled workers and translation costs 3.The fee of transportation, food and accommodation cost in destinationplace. 4.Personal safety 5.Installation tool 6. workshop, concrete silo, equipment foundation and so 7.Illumination of the factory and workshop. 8.Transformer, high and low pressure measurement cabinet, kinetic tank and power electric cable. 9.Inside and outside the room gives draining water and the fire prevention. | |
SGB-O200 | USD219,000 | |||
Payment | 1.30 % of the Total Cost of the Equipment, within 14 calendar days from the date of the signing of the Contract by the Parties.2.60 % of the Total Cost of the Equipment before the date of loading. 3.5 % of the Total Cost of the Equipment within 14 calendar days from the date of workers arrive plant. 4.balance of 5 % of the Total Cost of the Equipment within 14 calendar days from the date of completion of testing. | |||
Price effective time | One mooth | |||
consumption of raw material(thickess :9mm Per square metre)
Paper | Gypsum powder | Water | Modified starch | Vesicant | White latex | Electricity | Coal |
0.44KG | 6.8KG | 4.86KG | 0.05KG | 0.0044KG | 0.0027KG | 0.14KW | 0.96KG |
gypsum board production line